• Privacy Policy
  • Terms
  • About us
  • Contact Us
  • Staff Email
Sunday, July 27, 2025
  • Login
TheMattersPress
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
TheMattersPress
No Result
View All Result
Home News

TCN reports towers collapse due to fire caused by pipeline vandalism

The Matters Press by The Matters Press
December 25, 2021
Reading Time: 2 mins read
0
Power line to energise part of Oyo

The Transmission Company of Nigeria(TCN) says  that an inferno caused by a vandalised pipeline along Isheri Olofin, off Igbando – LASU expressway of Lagos State, has caused massive damage to 330 Kilo Volt (kV) Ikeja-West Akangba transmission line 1.

RELATED POSTS

Alleged Wasteful Turn Around Maintenance (TAM) of Refineries: Setting the records straight

IMPI seeks forensic audit of refineries from 2000 to 2023 ‎ ‎

‎ADC erred, APC administrations never spent $18bn on refineries-IMPI ‎

Mrs Ndidi Mbah, TCN’s General Manager,Pubic Affairs made this known in a statement in Abuja on Friday.

Mbah said that the  inferno burned  off a large portion of the conductor.

She said the inferno also triggered a resistant pull on the high-tension towers along the line route causing five of them to collapse.

“The incident which is estimated to have occurred at about 00.29 in the early hours of today, burnt a wide portion of the 330kV transmission line which wheels 145 Mega Watts (MW} of bulk power to the Akangba Substation.

“The transmission towers affected are the two closest to the site of the incident and three across the Lagos Canal.

“As a result of the incident, there is a major reduction of bulk power wheeled to TCN’s 330/132/33kV Akangba Transmission Substation in Lagos.

However, due to the fact that the substation takes supply from two different 330kV transmission lines, with the second being the redundant line,”she said.

Mbah said that TCN would rearrange bulk electricity transmitted on that line route to the second 330kV previously carrying 59MW.

She said that TCN was successfully back-feeding the substations affected by the towers collapse, while the engineers are patrolling the second 330kV transmission line .

“Which tripped as a result of the incident, to ensure it has no fault before it is energised.

“Once it is energised, supply will be restored to all the substations affected by the incident from the second 330kV transmission line, as the load carried by the burnt 330kV line will now be transferred to the second line,”she said.

Mbah said that incidents such as this was a major setback to TCN’s concerted efforts in  implementing its grid expansion and stability programme under its well-articulated Electricity Grid Maintenance, Expansion and Rehabilitation Programme.

According to her, the re-erection of five towers and restringing of the 330kV transmission line is a major project that costs a lot of money and will take a while to complete.

She said that TCN  was appealing to Nigerians to desist from activities such as oil bunkering, and other destructive tendencies, as they all have very far-reaching negative effects on the nation at large.

“The issue of protecting our national assets is imperative and must be taken very seriously so that the stability of the nation’s network and the development of the nation is not compromised.

Tags: TCN
ShareTweetPin
The Matters Press

The Matters Press

Related Posts

POLICY STATEMENT 027 BY THE INDEPENDENT MEDIA AND POLICY INITIATIVE (IMPI)
Economy/Technology

Alleged Wasteful Turn Around Maintenance (TAM) of Refineries: Setting the records straight

July 25, 2025
Dangote Fertilizer in gas supply deal
Economy/Technology

IMPI seeks forensic audit of refineries from 2000 to 2023 ‎ ‎

July 25, 2025
Nigeria’s Dangote refinery will cut Africa’s petrol import by 36%
Economy/Technology

‎ADC erred, APC administrations never spent $18bn on refineries-IMPI ‎

July 25, 2025
Nigerian firms to handle $4b gas project
Economy/Technology

ADC’s claim on refinery sale, horrendous half truth

July 23, 2025
Tinubu inaugurates economic council
Energy

‎No political undertone in Tinubu’s befitting honour for Buhari, TDF ‎

July 23, 2025
Babangida Aliyu’s Exit from ADC, a testament to Coalition’s deceitful recruitment- Group
Economy/Technology

‎Stop scapegoating Tinubu, stick to ethics of internal democracy, Group tells ADC ‎

July 20, 2025
Next Post
Fraud in banking sector, mostly insider instigated

New generation banks acquiring older ones

Nigeria loses $25b to foreign ship owners

Nigeria expects 27 ships with products at Lagos ports

Recommended Stories

China’s commerce ministry to promote services trade

Trade: China Shandong encourages Nigerian farmers, enterprises with Expo

November 5, 2022
Experts validate Nigeria’s implementation strategies for success under AfCFTA

Federal, States, Council share N1.08trn November

December 16, 2023
Nissan recalls 1,150,000 vehicles in 3 months

FG proposes 1m gas-powered vehicles by 2027 –Director

December 30, 2023

Popular Stories

  • Rising prices of goods cause protests in Morocco

    Rising prices of goods cause protests in Morocco

    0 shares
    Share 0 Tweet 0
  • NLNG not responsible for gas supply shortfall, price hike

    0 shares
    Share 0 Tweet 0
  • NCC sets fresh operational fees, spectrum prices for telecom operators

    0 shares
    Share 0 Tweet 0
  • Hoarding causes hike in prices of grains

    0 shares
    Share 0 Tweet 0
  • Prices of Petrol, diesel increase in November

    0 shares
    Share 0 Tweet 0
TheMattersPress

We bring you the best news update in Nigeria

LEARN MORE »

Recent Posts

  • Alleged Wasteful Turn Around Maintenance (TAM) of Refineries: Setting the records straight
  • IMPI seeks forensic audit of refineries from 2000 to 2023 ‎ ‎
  • ‎ADC erred, APC administrations never spent $18bn on refineries-IMPI ‎

Categories

  • Agriculture
  • Economy/Technology
  • Energy
  • Entertainment/sports
  • Features
  • Foreign
  • Multimedia
  • Natural Resources
  • News
  • Oil and Gas
  • Photo
  • Politics
  • Security
  • Thematterspress
  • Uncategorized
  • Video

© 2025 Domo Tech World - Powered by Thematterspress.

No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us

© 2025 Domo Tech World - Powered by Thematterspress.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
Call Us