• Privacy Policy
  • Terms
  • About us
  • Contact Us
  • Staff Email
Thursday, May 15, 2025
  • Login
TheMattersPress
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
TheMattersPress
No Result
View All Result
Home Economy/Technology

TCN delivers 22 transformers, equipment to central store – official

Transformers

The Matters Press by The Matters Press
November 29, 2022
Reading Time: 3 mins read
0
Siemens’ transformers for Nigeria pass acceptance test

The Transmission Company of Nigeria (TCN) says it has delivered 22 brand new power transformers and other critical equipment to its Central Store in Ojo, Lagos.

RELATED POSTS

Nigeria First policy, unique, revolutionary – TMSG

Group seeks action against the menace of fake news, deliberate falsehood

Nigeria’s upgrade of health centres, a major milestone in Renewed Hope Agenda

Mrs Ndidi Mbah, the General Manager Public Affairs of TCN’s made this known in a statement on Tuesday in Abuja.

Mbah said that as more of the equipment arrive Lagos Port for onward delivery to the store, they would be subsequently installed at various ongoing project sites across the country.

She said that some of the equipment would be kept in the store to serve as spares for future use.

The TCN official said that massive and unprecedented stockpile of various kinds of transmission equipment were gradually being moved to project sites for maintenance.

”New projects and upgrading of existing transmission lines and substation are also being carried out.

”The equipment described as the highest of such in the company’s history, comprising 22 power transformers, haulage trucks, transmission switchyard spare parts, 45 number earthing transformers,

”Suspension clamps, vibration dampers, armour rods, circuit breakers, current transformer, voltage transformers, 100 tonnes of crane truck heads,’’ she said.

Mbah said that recently the Technical and Monitoring Committee of the Governing Board of TCN led by the Committee’s Chairman, Mr Nsima Ekere, visited the Ojo store to inspect a large number of equipment.

She said that the visit was part of the committee’s two-day visit to Lagos region where they inspected key power transmission substations.

Speaking after the inspection, Ekere lauded TCN for the record stock delivery to the store.

He said that the committee had seen loads of equipment that gave the members hope that the new dawn “that is expected at the company is here’’.

”We saw about 30 forklifts, mobile transformers, reconditioning facilities, all kinds of things, the conductors, isolators, several other equipment and electric scaffold mobile scissors among others.

”These are all to improve the capacity of TCN’s efficiency in doing their work. I am convinced that the transmission grid expansion project that TCN is presently executing is ongoing

”I must also commend the World Bank and other donor agencies that are helping us with funding,” he said.

According to him, with the massive stock at the TCN central store, the capacity of TCN to wheel power is definitely being enhanced.

The Managing Director of TCN, Mr Sule Abdulaziz said that most of the equipment were procured for donor funded projects supported by the World Bank, French Development Agency (AFD), African Development Bank, among others.

Abdulaziz, said that the resources had been committed by donor agencies, assisting the transmission company in its grid expansion drive.

He said that the capacity of the transformers ranges from 60 MVA up to 150MVA.

“We have not seen this level of massive supply of materials in TCN stores in the past, purely for network expansion and maintenance.

”We have 150MVA transformers which are very massive and will eventually be connected on our 330kV circuit.

”We have the 100MVA transformers, high-grade cranes and other equipment. It implies that the turnaround time to rectify faults when they occur and the downtime have been reduced,” he said.

He listed other equipment delivered to the Lagos store to include circuit breakers, isolators, aluminium conductors among others.

According to him, the equipment is what TCN requires to ensure that the system becomes more stable.

He said that with the new equipment, TCN can now ensure constant maintenance of the grid due to availability of spares.

”Also, expansion and prompt scheduled maintenance of the grid will ensure a more efficient and effective transportation of bulk electricity to distribution load centre’s nationwide for the benefit of Nigerians.

”The projects, when completed, will further enhance the quality and stability of bulk supply as well as longer hours of power supply, ”he said.

Tags: Transformers
ShareTweetPin
The Matters Press

The Matters Press

Related Posts

IMPI releases new policy statement in defence of the Nigerian economy
Economy/Technology

Nigeria First policy, unique, revolutionary – TMSG

May 15, 2025
Economy/Technology

Group seeks action against the menace of fake news, deliberate falsehood

May 14, 2025
Eulogising Africa’s efforts in midwifing a Covid-19 vaccine
Economy/Technology

Nigeria’s upgrade of health centres, a major milestone in Renewed Hope Agenda

May 13, 2025
Rescued victims of human from Cote D Ivoire arrive Nigeria
Foreign

Rescued victims of human from Cote D Ivoire arrive Nigeria

May 11, 2025
Northern governors, traditional rulers call for accelerated action against Insecurity
News

Northern governors, traditional rulers call for accelerated action against Insecurity

May 11, 2025
Smile finally visits nurses, now on enhanced salary entry point
Economy/Technology

As enrollment of nurses peaks at 115,000, Nigeria ready to outsource medical personnel to the world – TMV

May 10, 2025
Next Post
Nigeria to allocate $200m for creation of agricultural service centres

ABU to commence mass production of farm implements

NDIC gives hope to customers of Fortis Bank

Bank failure: Depositors should go sleep, no deposit will be lost –NDIC

Recommended Stories

Nigeria to allocate $200m for creation of agricultural service centres

Take ownership of agro projects, FG urges South South farmers

December 15, 2022
Africa’s remittance inflows hit $72b

Non-oil exports record 6.26% growth, generates $2.7bn – NEPC

August 29, 2024
Do Not Be Distracted by Atiku’s Visit to Daura, TDF Tells Tinubu

Do Not Be Distracted by Atiku’s Visit to Daura, TDF Tells Tinubu

June 26, 2024

Popular Stories

  • Rising prices of goods cause protests in Morocco

    Rising prices of goods cause protests in Morocco

    0 shares
    Share 0 Tweet 0
  • NLNG not responsible for gas supply shortfall, price hike

    0 shares
    Share 0 Tweet 0
  • NCC sets fresh operational fees, spectrum prices for telecom operators

    0 shares
    Share 0 Tweet 0
  • Hoarding causes hike in prices of grains

    0 shares
    Share 0 Tweet 0
  • Prices of Petrol, diesel increase in November

    0 shares
    Share 0 Tweet 0
TheMattersPress

We bring you the best news update in Nigeria

LEARN MORE »

Recent Posts

  • Nigeria First policy, unique, revolutionary – TMSG
  • Group seeks action against the menace of fake news, deliberate falsehood
  • Nigeria’s upgrade of health centres, a major milestone in Renewed Hope Agenda

Categories

  • Agriculture
  • Economy/Technology
  • Energy
  • Entertainment/sports
  • Features
  • Foreign
  • Multimedia
  • Natural Resources
  • News
  • Oil and Gas
  • Photo
  • Politics
  • Security
  • Thematterspress
  • Uncategorized
  • Video

© 2025 Domo Tech World - Powered by Thematterspress.

No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us

© 2025 Domo Tech World - Powered by Thematterspress.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
Call Us