• Privacy Policy
  • Terms
  • About us
  • Contact Us
  • Staff Email
Saturday, December 13, 2025
  • Login
TheMattersPress
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
TheMattersPress
No Result
View All Result
Home Economy/Technology

Uganda Railways to add three train routes

Uganda

The Matters Press by The Matters Press
March 5, 2023
Reading Time: 2 mins read
0

Uganda Railways Corporation (URC) has said its expansion drive to rehabilitate railway routes in the Kampala Metropolitan will add 300 city passengers on a daily basis.

RELATED POSTS

Rescue of 100 abducted students shows Tinubu’s proven commitment to national security – TMSG

Disbursement of N4.7b TVET stipends, way to go in skill acquisition – TMV

ECOFEST 2025: A facet of African cultural engineering showcased in the digital pavilions

Ms Jessica Bakabazira, the URC chief commercial officer, said the expansion plan is meant to extend passenger services to Mukono, Kyengera and Port Bell areas.

“This will involve the construction of concrete sleeper lines to those areas and procurement of Diesel Multiple Units.

“We shall also have more coaches procured to serve these areas,” she said, noting that the first phase of constructing and renovating the new routes will commence next month (April) starting with the Kampala- Mukono line, during which passenger service will be transferred to the Kampala-Port Bell route.

Current data from Uganda Railways Corporation indicates that the passenger train services, which covers the Kampala-Namanve route has an average capacity of 1,500 passengers in five train coaches at an interval of 45 minutes, including the return trip on a daily basis.

Passengers using the train coaches pay Shs1,000 on each trip with boarding stations in Kampala, Kireka, Namanve, Bweyogere, and Namboole.

Ms Bakabazira was speaking at the launch of a pilot project dubbed, Tutambule Ffena which is aimed at offering passengers the much needed first and last mile to and from the train at specified terminals including, Kampala, Namboole and Namanve stations.

The pilot project will allow passengers to purchase train tickets through SafeBoda and Easy Matatu apps.

Passengers will also have an opportunity to access information on planned train schedules and unprecedented delays in scheduling, among others.

Mr Andrew Lema, the Easy Matatu founder, said this will address the issue of high costs of long distance trips, long duration spent in transit and limited access to digital payment methods.

“We have mapped 11 routes for the working class commuters using clean transport. We understand most public transport [systems] in Africa are broken. That is why we are using a blended approach with different mobility partners in harnessing transport using technology,” he said.

Ms Catherine Tulina Kafumbe, the SafeBoda deputy country director, said the SafeBoda app will take care of the passenger’s first mile and last mile travels to and from the railway station, and to their places of aboard.

Uganda’s railway system has suffered under years of neglect with the largest portion of the network totally broken down.

However, government has recently revived that talk of refurbishing the network and donors are beginning to show willingness to fund the refurbishment.

In August 2020, URC said government had secured funding from the Spanish government and African Development Bank to a tune of €330m to revamp the Meter Gauge Railway by rehabilitating about 250 kilometers from Malaba- Kampala.

The funding particularly from the AfDB will involve refurbishing the Namanve-Tororo, Port Bell line, Jinja Pier and Kampala-Kyengera railway line.

This will also include the construction of passenger halts and hubs and railway reserve fencing.

Ministry of Transport in December said construction of a factory for manufacturing concrete sleepers for refurbishment works on Mukono-Kampala railway line (25km) had commenced.

This is being undertaken by Imathia, a Spanish company that was awarded the contract for the rehabilitation of the Railway line.

Monitor

Tags: Uganda
ShareTweetPin
The Matters Press

The Matters Press

Related Posts

Gombe: Troops take over to enforce peace
News

Rescue of 100 abducted students shows Tinubu’s proven commitment to national security – TMSG

December 11, 2025
Nigerians kick against re-opening of schools as COVID-19 bites harder
Economy/Technology

Disbursement of N4.7b TVET stipends, way to go in skill acquisition – TMV

December 11, 2025
ECOFEST 2025: A facet of African cultural engineering showcased in the digital pavilions
Energy

ECOFEST 2025: A facet of African cultural engineering showcased in the digital pavilions

December 5, 2025
Restitution and Protection of Cultural Property: Felwine Sarr Calls for “Reimagining the African Museum”
Foreign

Restitution and Protection of Cultural Property: Felwine Sarr Calls for “Reimagining the African Museum”

December 5, 2025
ECOFEST 2025: Addressing Key Challenges to Artistic Mobility within the Region
Foreign

ECOFEST 2025: Addressing Key Challenges to Artistic Mobility within the Region

December 4, 2025
Senate Confirms Musa as Defence Minister
Energy

Senate Confirms Musa as Defence Minister

December 3, 2025
Next Post
Africa-Europe Alliance presents progress report

UNECA urges Africa to integrate protection of natural resources

UNECA urges media to pressure govts on policies

Africa needs large scale investment for economic productivity — UNECA

Recommended Stories

Why liquefied petroleum gas should be transition fuel in developing countries

Why liquefied petroleum gas should be transition fuel in developing countries

January 22, 2022
Maritime sector critical to economic growth — Shippers

Maritime nations need finance to develop fossil fuel

November 21, 2022
Nigeria pledges to remove of bottlenecks, enhance free movement of investors’ funds

Nigeria pledges to remove of bottlenecks, enhance free movement of investors’ funds

November 12, 2023

Popular Stories

  • Rising prices of goods cause protests in Morocco

    Rising prices of goods cause protests in Morocco

    0 shares
    Share 0 Tweet 0
  • NLNG not responsible for gas supply shortfall, price hike

    0 shares
    Share 0 Tweet 0
  • NCC sets fresh operational fees, spectrum prices for telecom operators

    0 shares
    Share 0 Tweet 0
  • Hoarding causes hike in prices of grains

    0 shares
    Share 0 Tweet 0
  • Prices of Petrol, diesel increase in November

    0 shares
    Share 0 Tweet 0
TheMattersPress

We bring you the best news update in Nigeria

LEARN MORE »

Recent Posts

  • Rescue of 100 abducted students shows Tinubu’s proven commitment to national security – TMSG
  • Disbursement of N4.7b TVET stipends, way to go in skill acquisition – TMV
  • ECOFEST 2025: A facet of African cultural engineering showcased in the digital pavilions

Categories

  • Agriculture
  • Economy/Technology
  • Energy
  • Entertainment/sports
  • Features
  • Foreign
  • Multimedia
  • Natural Resources
  • News
  • Oil and Gas
  • Photo
  • Politics
  • Security
  • Thematterspress
  • Uncategorized
  • Video

© 2025 Domo Tech World - Powered by Thematterspress.

No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us

© 2025 Domo Tech World - Powered by Thematterspress.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
Call Us