• Privacy Policy
  • Terms
  • About us
  • Contact Us
  • Staff Email
Monday, February 23, 2026
  • Login
TheMattersPress
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
TheMattersPress
No Result
View All Result
Home Economy/Technology

Zungeru hydropower boost Nigeria’s electricity generation

Zungeru

The Matters Press by The Matters Press
October 9, 2023
Reading Time: 2 mins read
0
Zungeru Hydropower project to engage skilled professionals

Abuja, Oct. 9, 2023: Sinohydro Corporation Ltd., and China National Electric Engineering Company, both Chinese consortium, have said the Zungeru hydropower project would boost sustainable electricity power supply in Nigeria.

RELATED POSTS

TMSG hails Tinubu’s swift assent to the 2026 Electoral Act

Tinubu signs amended electoral Act

TDF hails Tinubu for speedy implementation of FG-ASUU agreement

It also said that the project is set to make a significant contributions to Nigeria’s power generation capacity.
The consortium made this known in a joint statement by the organisations on Sunday.

According to the statement, the Zungeru hydropower project proved China-Nigeria partnership at its best and it would boost Nigeria’s power generation capacity.

The statement said, “The Zungeru project is estimated to generate 2.64 billion kWh of electricity annually, which will meet close to 10 per cent of Nigeria’s total domestic energy needs.

“It will provide flood-control, irrigation, water-supply and fish-breeding facilities; although construction works on the power plant started in May 2013, it is expected to take 60-months for completion with initial completion date of 2018.

“However, legal and financial challenges related to ecological settlement in the affected area delayed the project commissioning to 2021.

“The global pandemic COVID-19 further delayed the construction period as the site was shut down from operation in the year 2020 during the peak of the pandemic.”

The statement explained that the engineering, procurement, and construction contract was awarded to a Chinese consortium comprising China National Electric Engineering Company (CNEEC) and Sinohydro.

It said amidst security challenges such as attack on workers at the site in 2022, Zungeru hydropower project progressed, adding that as of Aug. 15, 2023, the project was successfully handed over to the Federal Government.

“The Zungeru hydropower project located on the Kaduna River in Niger is a 700MW hydroelectric facility built by a Chinese consortium comprising Sinohydro Corporation Limited and CNEEC.

“The project which costs about $1.3bn approximately (₦162.9 billion) is the biggest power project completed in Nigeria in the past ten years and one of the biggest power projects in Africa.

“To avail preferential loan facility from the Export-Import Bank (Exim Bank) of China; the project is designed to generate 2,630 GWh energy with a total installed capacity of 700MW.

“The main components of Zungeru hydropower project include 2,400m Roller-Compacted Concrete (RCC) gravity feed dam, underground powerhouse behind the RCC dam, tailrace-channel and two switchyards on both banks of the river.

Tags: Zungeru
ShareTweetPin
The Matters Press

The Matters Press

Related Posts

EU punctures Atiku’s server story
Economy/Technology

TMSG hails Tinubu’s swift assent to the 2026 Electoral Act

February 20, 2026
Tinubu signs amended electoral Act
Economy/Technology

Tinubu signs amended electoral Act

February 18, 2026
Salvaging basic education from ruins of Boko Haram war in Borno
Economy/Technology

TDF hails Tinubu for speedy implementation of FG-ASUU agreement

February 13, 2026
Obi, PDP candidate advises Buhari to increase tempo
Economy/Technology

Peter Obi’s utterances on Student Loan Scheme disappointing,a lack of empathy – Group

February 13, 2026
Nigerians to own brand new vehicles, goods through new credit scheme initiative
Economy/Technology

Tinubu’s state visit to the UK shows Nigeria bouncing back to glexobal reckoning, 37 years after last royal invitation – TMV*

February 11, 2026
Tinubu explains mission as he marks second year in office
Economy/Technology

Nigeria, UAE deal will drive non-oil growth, deepen economic partnership

January 18, 2026
Next Post
Firms bid for Ajaokuta steel

Ajaokuta Steel can employ 500,000 Nigerians - Tinubu

Nissan recalls 1,150,000 vehicles in 3 months

Subsidise conversion of vehicle to CNG, expert urges FG

Recommended Stories

NEITI raises committee on contract transparency

Nigeria due for EITI validation 2023 – NEITI

September 17, 2022
Facts to know about Stamp Duty

Stamp duty revenue is N370bn, not N89trn as claimed

January 24, 2023
“Naira-4-Dollar” getting results

Naira drops to N461.50 against dollar

March 28, 2023

Popular Stories

  • Rising prices of goods cause protests in Morocco

    Rising prices of goods cause protests in Morocco

    0 shares
    Share 0 Tweet 0
  • NLNG not responsible for gas supply shortfall, price hike

    0 shares
    Share 0 Tweet 0
  • NCC sets fresh operational fees, spectrum prices for telecom operators

    0 shares
    Share 0 Tweet 0
  • Hoarding causes hike in prices of grains

    0 shares
    Share 0 Tweet 0
  • Prices of Petrol, diesel increase in November

    0 shares
    Share 0 Tweet 0
TheMattersPress

We bring you the best news update in Nigeria

LEARN MORE »

Recent Posts

  • TMSG hails Tinubu’s swift assent to the 2026 Electoral Act
  • Tinubu signs amended electoral Act
  • TDF hails Tinubu for speedy implementation of FG-ASUU agreement

Categories

  • Agriculture
  • Economy/Technology
  • Energy
  • Entertainment/sports
  • Features
  • Foreign
  • Multimedia
  • Natural Resources
  • News
  • Oil and Gas
  • Photo
  • Politics
  • Security
  • Thematterspress
  • Uncategorized
  • Video

© 2025 Domo Tech World - Powered by Thematterspress.

No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us

© 2025 Domo Tech World - Powered by Thematterspress.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
Call Us