• Privacy Policy
  • Terms
  • About us
  • Contact Us
  • Staff Email
Wednesday, April 15, 2026
  • Login
TheMattersPress
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
TheMattersPress
No Result
View All Result
Home News

South East rail in progress, Amaechi assures Igbo

The Matters Press by The Matters Press
November 28, 2018
Reading Time: 3 mins read
0
South East rail in progress, Amaechi assures Igbo

Rail

Rail

Nigeria has placed an advertisement on the Eastern Rail lines, a component of the $12 billion Port Harcourt to Maiduguri railway.

RELATED POSTS

TMSG to ADC: You are a motley crew of power mongers, palace jesters

NLC’s insistence on eating the seed and expecting a harvest is a metaphor for an absurdity

Why Nigeria must use oil windfall to build a more resilient economy – IMPI

Transport minister Rotimi Amaechi said that work is in progress as “everything Is being done systematically; we cannot do all the projects at the same time’’.

“Currently, we are following due process for the one of South-East,” Amaechi explained to the Senate Joint Committee on Land Transport, and Local and Foreign Debts.

“Even the narrow gauge construction does not only concern the South East.

“The same narrow gauge transverses Port Harcourt to Maiduguri.

“So, for the railway you want to do from Port Harcourt to Maiduguri is about 12 billion dollars and that is one year budget of Nigeria.

“What we are doing is as we get the loan approved, we execute the project.

Amaechi denied the alleged exclusion of Eastern rail line from Port Harcourt to Maiduguri in the ongoing nationwide rail construction and modernisation.

Amaechi said contrary to the claim of exclusion, there was only delay in the execution of the project.

He said the delay was due to bureaucratic bottlenecks caused by the Public Procurement Act.

According to him, the Public Procurement Act is very tedious, stressing “it takes a long time to conclude the process”.

“Sometime in 2017, we placed an advertisement for rail from Port Harcourt to Maiduguri and that is what the law expects us to do. We cannot skip the law on construction of standard gauge.’’

Amaechi added that railway project was capital intensive, noting that the Federal Government did not have sufficient fund to implement the project across the country at the same time.

He explained that following the paucity of funds, government decided to adopt a systematic approach in the project execution.

He further explained that the government could only apply funds to projects as loans were approved.

“The president insists on rule of law and the law passed by the National Assembly in terms of public procurement is very tedious and not easy to conclude; it takes a very long time.

“We have met with the consortium handling the project for nearly two years.

“Secondly, in that meeting we had in 2017, I reassured our people that they are not more Igbo than I am.

“Let me make it clear, the country does not have the resources to do railway in every village. It is not possible. 2.7 billion dollars is one trillion Naira.

“I do not know what other thing the Senate expects from me on this project except to say that it is work in progress.”

On the insinuation that General Electric (GE) had pulled out of the project, Amaechi explained that the company handed over the contract to another company because it was no longer in the transport business.

“It (GE) handed over the job to another sister company in the consortium which is Trans-net.

“We are at the verge of signing the contract agreement and it is when we finish signing the consortium agreement that we will begin to look for money to execute the project.

“The total cost of the project is 2.7 billion dollars and it is a private partnership agreement,” he said.

The Chairman of the Committee, Sen. Gbenga Ashafa, urged the minister to ensure that no section of the country was excluded from the rail project.

The Senate had mandated its committee on Land Transport as well as Local and Foreign Debts, to summon the minister.

The joint committee was mandated to get clarification on the alleged exclusion of Eastern rail line in the nationwide railway projects across the country, captured in the foreign loan obtained by President Muhammadu Buhari for that purpose.

Sen. Enyinnaya Abaribe (PDP-Abia) had raised a similar motion at plenary in 2017.

Tags: RailSouth East
ShareTweetPin
The Matters Press

The Matters Press

Related Posts

TMSG to ADC: You are a motley crew of power mongers, palace jesters
Economy/Technology

TMSG to ADC: You are a motley crew of power mongers, palace jesters

April 6, 2026
NLC’s insistence on eating the seed and expecting a harvest is a metaphor for an absurdity
Economy/Technology

NLC’s insistence on eating the seed and expecting a harvest is a metaphor for an absurdity

April 3, 2026
Presidential aides hail IMPI’s boss, Akinsiju at 63, commend his role in advancing Nigeria’s reform.
Economy/Technology

Why Nigeria must use oil windfall to build a more resilient economy – IMPI

March 30, 2026
Tanzania, Australia firms sign $667m deal to mine rare earths
Economy/Technology

$1.3bn landmark FG/AFC Alumnia deal, transformative economic booster–TMV

March 7, 2026
Eulogising Africa’s efforts in midwifing a Covid-19 vaccine
Economy/Technology

Injection of N98bn in 13,500 Centres will Boost Primary Healthcare Nationwide – Group

March 7, 2026
CAC, Pakistani investors on economic diversification
Economy/Technology

Progressivism: The Place of Ideology in Tinubu’s Management of Nigeria’s Economy

March 1, 2026
Next Post
Killing of 44 soldiers irks Reps

Killing of 44 soldiers irks Reps

Osinbajo excites traders at Apo mechanic market

Osinbajo excites traders at Apo mechanic market

Recommended Stories

South Africa in load shedding to manage dip in power

Africa needs $40bn annual grid investments for stable electricity

November 1, 2022
FIRS deploys tech platform for tax collection

FIRS Takes Tax Clearance Certificate Online

January 3, 2023
Chevron, NNPC secure $1.4bn for drilling project

Nigeria hosts conference on oilfield sustainability, hydrocarbon accounting

March 22, 2024

Popular Stories

  • Rising prices of goods cause protests in Morocco

    Rising prices of goods cause protests in Morocco

    0 shares
    Share 0 Tweet 0
  • NCC sets fresh operational fees, spectrum prices for telecom operators

    0 shares
    Share 0 Tweet 0
  • NLNG not responsible for gas supply shortfall, price hike

    0 shares
    Share 0 Tweet 0
  • Hoarding causes hike in prices of grains

    0 shares
    Share 0 Tweet 0
  • Prices of Petrol, diesel increase in November

    0 shares
    Share 0 Tweet 0
TheMattersPress

We bring you the best news update in Nigeria

LEARN MORE »

Recent Posts

  • TMSG to ADC: You are a motley crew of power mongers, palace jesters
  • NLC’s insistence on eating the seed and expecting a harvest is a metaphor for an absurdity
  • Why Nigeria must use oil windfall to build a more resilient economy – IMPI

Categories

  • Agriculture
  • Economy/Technology
  • Energy
  • Entertainment/sports
  • Features
  • Foreign
  • Multimedia
  • Natural Resources
  • News
  • Oil and Gas
  • Photo
  • Politics
  • Security
  • Thematterspress
  • Uncategorized
  • Video

© 2025 Domo Tech World - Powered by Thematterspress.

No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us

© 2025 Domo Tech World - Powered by Thematterspress.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
Call Us