• Privacy Policy
  • Terms
  • About us
  • Contact Us
  • Staff Email
Tuesday, July 1, 2025
  • Login
TheMattersPress
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
TheMattersPress
No Result
View All Result
Home News

Pace of work on Lekki Deep Seaport excites minister

Seaport

The Matters Press by The Matters Press
January 24, 2022
Reading Time: 2 mins read
0
Pace of work on Lekki Deep Seaport excites minister


The Minister of Transportation, Mr Rotimi Amaechi, has commended the pace of work on the Lekki Deep Seaport project, and expressed hope that services would commence at the port by the last quarter of 2022.

RELATED POSTS

Nasarawa showcases efficient use of fuel subsidy savings, exposes futility of Tinubu’s opposition’s mischief – TDF

Transformational in FCT in line with Tinubu’s Renewed Hope agenda

Ignore Atiku’s claim to dilute historic mechanised farming deal with Belarus

The minister, who undertook an assessment tour of the port site on Sunday, described the level of construction work as “very impressive”, and commended the management of the Nigerian Ports Authority (NPA) for availing the contractors the necessary support.

The minister, who was accompanied by the Acting Managing Director of NPA, Mohammed Bello-Koko, and Executive Secretary of Nigerian Shippers Council, Mr Emmanuel Jime, charged the contractors to sustain the tempo of work.

He specifically enjoined them to re-double their efforts to ensure that the scheduled inaugural date and commencement of cargo operations was achieved, and reminded them of President Mohammadu Buhari’s commitment to delivering efficient port services, in line with international best practices.

Speaking to the project contractors on his observations, he said: “the last time we came, there was no quay wall, just the breakwaters. But today, there are many visible improvements.

“It doesn’t mean that you have delivered; it simply means you will achieve it. The last time we came, your chairman said it wasn’t possible, and I told him wait and see, if it’s not possible, then you know that I am not Minister of Transport.

“We are supposed to commission by September, which is in the old agreement, but if you double your efforts on this job, we can commission (it) by July”.

In his remarks, Mr Laurence Smith, the Chief Operating Officer of Lekki Port/Lekki Free Trade Zone (LFTZ), thanked the minister for the visit, and appealed for increased government support on the construction of access roads to the port location.

He also emphasised the need to link the port to the national railway grid.

Smith acknowledged the support and synergy provided by the NPA management, especially in the procurement of Vessel Tracking System (VTS) for the Lekki channel and other port locations in the country, two 80 tons bollard pull ASG Tugboats, and two pilot boats for deployment to the Lekki Deep Seaport.

Meanwhile, Mr Ibrahim Nasiru, General Manager, Corporate and Strategic Communications of the NPA, has said that the port would have a truck parking area with a capacity for 300 trucks to avoid indiscriminate parking of trucks on the access road to the port when it becomes operational in the next few months.

In a statement on Sunday, he said that the terminal area, the Customs Building, would have a full-fledged examination bay for proper inspection before trucks are allowed to evacuate the area.

There is also a dedicated area for impounded goods, he added.

It added that construction is ongoing for reefer connections to handle perishable commodities, and erection of light masts which would be 25m high, so that the whole area is fully lit 24hrs daily.

Dredging and reclamation work is now at 89.93 percent completion, quay wall 85.65 percent completion, breakwater 79.66 percent completion, land-side infrastructure, 6.82 percent completion, thus bringing total works carried out on the project to approximately 80 percent completion, the statement added.

Equity owners of the Lekki Deep Seaport are Tolaram Group, China Harbour Engineering Company, Lagos State Government and NPA, (on behalf of the Federal Government of Nigeria).

The project, on completion, will be a world class multi-purpose facility, serving as a regional distribution and trans-shipment hub for West and Central Africa.

Tags: Seaport
ShareTweetPin
The Matters Press

The Matters Press

Related Posts

Group hails Presidential Council initiative, welcomes President Tinubu’s N2tn stabilisation package
Economy/Technology

Nasarawa showcases efficient use of fuel subsidy savings, exposes futility of Tinubu’s opposition’s mischief – TDF

July 1, 2025
Property owners besiege FCT office to pay ground rent
Economy/Technology

Transformational in FCT in line with Tinubu’s Renewed Hope agenda

June 30, 2025
China’s agricultural wholesale products prices continue to drop
Agriculture

Ignore Atiku’s claim to dilute historic mechanised farming deal with Belarus

June 29, 2025
$2.5 billion JBS investment, a big economic victory for Nigeria –  TDF
Economy/Technology

Tinubu’s N60b Intervention in Gombe Agro-Livestock Zone excites group

June 27, 2025
ActionAid, SWOFON call for urgent completion of BOA recapitalisation
Agriculture

N1.5trn recapitalisation of Agric bank will herald food security – TMV

June 26, 2025
Lamido Wrong on Tinubu’s June 12 Role, haunted by his anti-democratic past- TDF
Energy

Lamido Wrong on Tinubu’s June 12 Role, haunted by his anti-democratic past- TDF

June 25, 2025
Next Post
Minister directs NSITF to re-adjust staff salaries

Minister directs NSITF to re-adjust staff salaries

Dangote petrochemicals, fertilizer plant will accelerate Africa’s economy- AfDB

Dangote petrochemicals, fertilizer plant will accelerate Africa’s economy- AfDB

Recommended Stories

NECA on how to address Nigeria’s economic challenges

NECA urges FG to set up Committee on national minimum wage

January 18, 2024
Army re-jigs senior officers

Army confirms 23 not 100 soldiers dead

November 29, 2018
Nigeria to allocate $200m for creation of agricultural service centres

166 farmers receive palliatives from IFAD-VCDP

December 26, 2022

Popular Stories

  • Rising prices of goods cause protests in Morocco

    Rising prices of goods cause protests in Morocco

    0 shares
    Share 0 Tweet 0
  • NLNG not responsible for gas supply shortfall, price hike

    0 shares
    Share 0 Tweet 0
  • NCC sets fresh operational fees, spectrum prices for telecom operators

    0 shares
    Share 0 Tweet 0
  • Hoarding causes hike in prices of grains

    0 shares
    Share 0 Tweet 0
  • Prices of Petrol, diesel increase in November

    0 shares
    Share 0 Tweet 0
TheMattersPress

We bring you the best news update in Nigeria

LEARN MORE »

Recent Posts

  • Nasarawa showcases efficient use of fuel subsidy savings, exposes futility of Tinubu’s opposition’s mischief – TDF
  • Transformational in FCT in line with Tinubu’s Renewed Hope agenda
  • Ignore Atiku’s claim to dilute historic mechanised farming deal with Belarus

Categories

  • Agriculture
  • Economy/Technology
  • Energy
  • Entertainment/sports
  • Features
  • Foreign
  • Multimedia
  • Natural Resources
  • News
  • Oil and Gas
  • Photo
  • Politics
  • Security
  • Thematterspress
  • Uncategorized
  • Video

© 2025 Domo Tech World - Powered by Thematterspress.

No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us

© 2025 Domo Tech World - Powered by Thematterspress.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
Call Us