• Privacy Policy
  • Terms
  • About us
  • Contact Us
  • Staff Email
Friday, July 18, 2025
  • Login
TheMattersPress
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us
No Result
View All Result
TheMattersPress
No Result
View All Result
Home Economy/Technology

Nigeria to increase TCN wheeling capacity by 1000 Megawatts

Electricity

The Matters Press by The Matters Press
November 12, 2022
Reading Time: 2 mins read
0
Strike puts Nigeria in darkness

Electricity distribution station

The Minister of Power, Mr Abubakar Aliyu, says the Federal Government plans to increase the Transmission Company of Nigeria (TCN) wheeling capacity by over 1000 Megawatts to boost electricity supply.

RELATED POSTS

Befitting honour for former President Buhari commendable – TMSG

17-member committee for burial of Buhari

Lagos falls flat to APC

Aliyu said this while inspecting the ”Abuja Ring Project” being executed by TCN on Friday in Abuja.

He said that the projects which are six in number were made up of lines and substations, adding that when completed it will increase TCN’s willing capacity with over 1000 Megawatts (MW).

”The project is about six and they are over 90 per cent completed and hope to be completed Nov, Dec, the contractor is chasing the completion date and when completed it will increase power supply in Abuja and environ.

”This project is funded by a loan of 170 million dollars from the French Development Agency (AFD) and started by President Muhammadu Buhari’s Administration in 2018 in the quest to increase the capacity the Nigerian Electricity Supply Industry (NESI), ”he said.

The minister said that the projects consist of a new substation in Dawaki, Gwarinpa, New Apo substation, Old Apo existing substation amongst others.
According to him, there has been a 132 Kilo Volt (KV)line existing from Suleja to Katampe which initially was at Kubwa.

He said the new substation would give Dawaki and environ more electricity as they have been depending on Kubwa.

He said that a platform had been built at Old Apo Substation to receive a 60 Mega Volt Ampree transformer from the Siemens Power Project and that in a couple of days, it will be installed.

”The new Apo substation is a new one and is recieving a 330 KVA line from Nassarawa to boost supply in Abuja and environ, ” he said.

Speaking on the Siemens Power Project, the minister said that some engineers would be going to France before the end of the month to do a factory test on some transformers.

Aliyu said that some of the transformers were already in the country and some on high sea.

According to him, the mobile substation with so many components will start coming in Jan. 2023 as they are being tested along with other transformers.

The minister appealed to Nigerians to be patient as government is doing a lot to improve power supply.

Tags: Electricity
ShareTweetPin
The Matters Press

The Matters Press

Related Posts

Befitting honour for former President Buhari commendable – TMSG
Economy/Technology

Befitting honour for former President Buhari commendable – TMSG

July 17, 2025
Buhari attends inauguration of Barrow of Gambia
Entertainment/sports

17-member committee for burial of Buhari

July 14, 2025
Lagos falls flat to APC
Economy/Technology

Lagos falls flat to APC

July 13, 2025
African intellectuals release letter to world, caution continent on selfness
Economy/Technology

Nigeria celebrates Soyinka at 91

July 13, 2025
China introduces new visa
Economy/Technology

Nigeria maintains issuance of 5-year visa to Americans

July 13, 2025
ADC, AN ASSEMBLAGE OF STRANGE BED FELLOWS, TIRED POLITICIANS– GROUP
Energy

ADC, AN ASSEMBLAGE OF STRANGE BED FELLOWS, TIRED POLITICIANS– GROUP

July 10, 2025
Next Post
SMEDAN to disburse N5.2m start-up grants to cooperatives

SMEDAN, Bloc sign MoU to provide financial technology services to SMEs

Nigeria, WFP worry over food situation

Food Security: Agric stakeholders appeals to FG/CBN to release Funds

Recommended Stories

Buhari moves to grow economy through private sector

February 26, 2022
UNECA urges media to pressure govts on policies

Informal cross-border trade key to intra-African trade – ECA

June 6, 2023
Egypt’s economic strides excite AfDB

Historic speech of Adesina, AfDB President at inauguration

September 1, 2020

Popular Stories

  • Rising prices of goods cause protests in Morocco

    Rising prices of goods cause protests in Morocco

    0 shares
    Share 0 Tweet 0
  • NLNG not responsible for gas supply shortfall, price hike

    0 shares
    Share 0 Tweet 0
  • NCC sets fresh operational fees, spectrum prices for telecom operators

    0 shares
    Share 0 Tweet 0
  • Hoarding causes hike in prices of grains

    0 shares
    Share 0 Tweet 0
  • Prices of Petrol, diesel increase in November

    0 shares
    Share 0 Tweet 0
TheMattersPress

We bring you the best news update in Nigeria

LEARN MORE »

Recent Posts

  • Befitting honour for former President Buhari commendable – TMSG
  • 17-member committee for burial of Buhari
  • Lagos falls flat to APC

Categories

  • Agriculture
  • Economy/Technology
  • Energy
  • Entertainment/sports
  • Features
  • Foreign
  • Multimedia
  • Natural Resources
  • News
  • Oil and Gas
  • Photo
  • Politics
  • Security
  • Thematterspress
  • Uncategorized
  • Video

© 2025 Domo Tech World - Powered by Thematterspress.

No Result
View All Result
  • Home
  • News
  • Features
  • Thematterspress
  • Multimedia
    • Audio
    • Photo
    • Video
  • About us
  • Contact Us

© 2025 Domo Tech World - Powered by Thematterspress.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
Call Us